Micropiles – Types, Advantages,Installation Method

INTRODUCTION TO MICROPILES

Micropiles are introduced as an efficient and cost-effective alternative to conventional pile foundations. Micropiles possess the capability to withstand heavy loads. They can be installed with compact and sophisticated machinery. This is achieved using cutting edge technology. The main advantage of a micropile is its ability to work in very congested and low height areas and on any soil surface irrespective of its type. Micropiles are best suited for piling, retrofitting & underpinning works, slope protection, soil stabilisation, etc. Another important feature of micropile is they can work with minimum disturbance to existing structures. They also minimize disruption to people around the area. Micro piles provide a very reliable and cost-effective alternate which is becoming an inevitable part of urbanisation.

  1. INTRODUCTION TO MICROPILES
  2. WHAT IS A MICROPILE?
  3. COMPONENTS OF A MICRO PILE
    1. REINFORCEMENT USED IN MICROPILING
      1. a) STANDARD REBAR CAGE
      2. c) THREADED SOLID REBAR SYSTEM
      3. d) HOLLOW THREADED BAR OR DRILL HOLLOW BAR SYSTEM
  4. DRILLING METHODS ADOPTED FOR MICRO PILES
    1. GROUTING METHODS ADOPTED IN MICRO PILES
      1. a) TYPE A MICROPILES
      2. b) TYPE B MICROPILES
      3. c) TYPE C MICROPILES
      4. d) TYPE D MICROPILES
  5. METHODOLOGY OF MICRO PILES
  6. WHY MICRO PILE IS PREFERRED AGAINST CONVENTIONAL PILE?
  7. Key Takeaways
  8. Conclusion

WHAT IS A MICROPILE?

Micropiles are bored /drilled cast in place friction piles whose diameter ranges from 50 mm to 300 mm. The drilled / bored holes are grouted with cement after placing the reinforcement bars. Micropiles can withstand axial loads, lateral loads, or both and can negotiate loads ranging between 3T to 300T and more. Micro piles are also known as mini piles, pin piles, root piles, etc based on their applications. The micropiles can penetrate any obstructions that can sometimes cause premature refusal while installing using conventional piling methods.

ALSO READ : PILE FOUNDATIONS, CLASSIFICATIONS OF PILE FOUNDATIONS

COMPONENTS OF A MICRO PILE

TYPICAL SECTION OF MICROPILE
TYPICAL SECTION OF MICROPILE

The figure represents a typical section of a micropile resting on a hard soil/ rock strata. The steel casing is restricted to the compressive strata and extends a bit into the hard strata for some anchorage. The surface area of contact between the ground and the concrete below the casing is known as bearing stratum.

The main components of micropiles are as follows

  • Reinforcement & casing
  • Grout

VIDEO : INSTALLATION OF MICROPILES

REINFORCEMENT USED IN MICROPILING

The reinforcement used in micropiles are divided into four categories

a) Standard rebar cage with centraliser
b) API pipe system 
c) Solid threaded rebars with or with out pipe casing
d) Hollow bar or Drill hollow bar system

a) STANDARD REBAR CAGE

REBAR CAGE

The rebar cage is the same as the cage used in conventional piling. Threaded couplers are used to join the bars together with staggered joints. A centraliser (as per fig) is used for positioning the rebar cage inside the bore.

b) API PIPE SYSTEM

API PIPE SYSTEM

API pipes (American petroleum Institute pipes ) are high-grade pipes having a diameter of 5 inches to 11 inches. These pipes are joined using high strength machined flush type joint threads. Both inside and outside of the API pipes shall be grouted with or without placing rebar. Centrally reinforcing type of solid threaded or standard rebar type (ref fig) can be used as rebar. API PIPE SYSTEMS are recommended for compression piles to maintain their lateral stability.

c) THREADED SOLID REBAR SYSTEM

Threaded solid rebar can be used alongside permanent/temporary casings and with API pipe as central reinforcements. Solid threaded Rebar constitutes a full threaded high strength bar that can be cut and jointed as per requirements. These bars not only functions to produce full tension and compression capacity but also enhances much-needed bonding with the grout.

d) HOLLOW THREADED BAR OR DRILL HOLLOW BAR SYSTEM

HOLLOW THREADED BAR SYSTEM
HOLLOW THREADED BAR SYSTEM

The hollow threaded rebar system is also known as a self-drilling hollow bar system. In this system, the hollow bar can function as a sacrificial drill bit. It gets converted to a central reinforcement. It can also be used to flush out the debris. This system can eliminate pre-drilling and frequent removal of pipes and drills. It can handle any condition relating to the installation of micropiles. When drilling is complete, an injection adapter (ref fig) performs the injection. It injects the cement mortar into the hollow core of the drill bit. This adapter is mounted with the drilling unit. The grout flushing simultaneously serves in stabilizing the borehole and filling the area.

DRILLING METHODS ADOPTED FOR MICRO PILES

The installation process of micro piles involves drilling or driving a bore through soils, rocks, overburden, etc. The most common methods adopted for drilling are:

Percussive Drilling used with a driving point/drill at the bottom of the permanent casing is defined as displacement method. When air is used as a flushing medium, it is defined as a non-displacement method.

Rotary drilling uses air or water as a flushing medium for removing the drilled materials from the drill hole. The air jet or water pumped through the drilling system exit at the drill bit end flushing out the cuttings.

GROUTING METHODS ADOPTED IN MICRO PILES

Grouts used for micropiles constitute a mixture of cement and water. Sand can also be added as per design requirements to reduce the overall cost. The micro piles are divided into four types based on the method of grouting

a) TYPE A MICROPILES

Type A micropiles use tremie grouting and through gravity head. The grouting is started from the bottom and follows a similar tremie grouting procedure followed in conventional piles.

b) TYPE B MICROPILES

TYPE B MICROPILES

After performing the initial tremie grouting, a pressure grouting is followed simultaneously with the lifting of the casing from the bond zone. The second stage pressure grouting is done through a preinstalled tube. Second stage grouting serves in enhancing grout soil bonding. The grouting will be done up to the bearing stratum and can be extended to the full length of the pile if required.

c) TYPE C MICROPILES

In these types of piles, pressure grouting is followed by tremie grouting. On completion of pressure grouting, a global injection grouting is performed through a pre-installed sleeve port pipe. This grouting shall be done before the hardening of primary tremie grout.

d) TYPE D MICROPILES

This method is similar to Type C . In this method primary grout is done under pressure and after hardening secondary grout is done through installed sleeve ports. Packers are also provided for multiple injections.

METHODOLOGY OF MICRO PILES

Methodology of Micropiling
Methodology of Micropiling

a) Drilling shall be commenced using a rotary rig or Rotary percussive drilling machine with casing attached to the drill bit and simultaneously pushed with the drill bit.

b) On reaching the founding level the drill bit is removed with casing left in the borehole.

c) Place reinforcement with centraliser in the borehole and followed by tremie grout with cement water mix.

d) The tremie grouting will be followed by a pressure grouting through preinstalled grouting tubes with simultaneously lifting of the casing.

e)The casing lifting to be done up to the compressive soil level with adequate bearing to the hard strata. (ref.fig) Complete pressure grouting of the bearing stratum area.

WHY MICRO PILE IS PREFERRED AGAINST CONVENTIONAL PILE?

a) Micropiles can be engaged in any challenging conditions involving soil and rock.

b) Micropiles can be customised and applied for difficult terrains and applications. The applications can either be in the form of new loads being added to an existing structure. They can also be used for arresting structural settlement. Additionally, they are for resisting uplift and dynamic loads. Micropiles are used for seismic retrofits or works involving underpinning and slope stabilisation.

b) Micropiles are used for rehabilitation projects as well as new constructions in difficult and access constraint terrains and settlement prone locations. For rehabilitation works in congested and low headroom height basements, micropiles prove to be a preferred option.

c) Micropiles penetrate any surface and can be installed even through an existing foundation making it one of the best possible solutions for foundation rehabilitation and strengthening works.

d) Micro piles can be used for slope stabilisation, embankment stabilisation, and other soil improvement and ground improvement works.

e)Micro piles can be used in areas where water table is high, urban back fills, areas having floating boulders or other difficult terrains that can’t even be accessed with a conventional pile.

d) Used extensively in the rehabilitation of monuments, old structures, sinking structures etc in all parts of the world.

Key Takeaways

  • Micropiles are an effective solution for difficult terrains and congested areas, making them ideal for urban projects.
  • Micropiling is a versatile method, allowing installation in any soil type and even through existing foundations.
  • Micropiles can bear both axial and lateral loads, supporting structures with capacities up to 300 tons.
  • Micropiling is widely used for foundation rehabilitation, structural retrofitting, and slope stabilization.
  • Micropiles provide reliable performance in areas with high water tables or floating boulders.
  • Micropiling offers minimal disruption to existing structures, making it suitable for projects in low-headroom or congested sites.

Conclusion

Micropiles are emerging as a perfect cost-effective option without any alternatives. Because of its design flexibility and wide range of applications micropiles are gradually entering into urban destiny.

Micropiles are becoming essential in modern construction due to their adaptability and strength. Micropiling offers a cost-effective solution for complex projects, including foundation rehabilitation, slope stabilization, and soil improvement. Their ability to penetrate various surfaces guarantees that micropiles are a preferred choice for challenging terrains. They can even penetrate through existing foundations, making them ideal for access-constrained environments. With advancements in micropiling technology, these piles provide superior load-bearing capacities. They minimize disruption. This makes them indispensable in both new constructions and retrofitting projects. As urbanization grows, micropiles will continue to play a vital role in foundation engineering.